About this tool

What is the Generator Size Calculator?

Many generators are rated in kVA, with the kW output beside it on the plate, so this version gives both: it adds up the running watts of everything you want on during load shedding, adds the largest motor starting surge, then divides by the generator's rated power factor (kW ÷ kVA on its plate) to give the minimum kVA. The current is shown at 230 V.

The default list is a typical suburban house during a slot: a fridge-freezer, a chest freezer, LED lights, the TV and router, chargers and a 1 hp borehole pump. Together they run at 3 650 W, the pump's start pushes the peak to 5 650 W, and the minimum rating comes out at 7.1 kVA at a 0.8 power factor. Untick the pump and the house fits a much smaller set.

How the generator connects matters as much as its size. Eskom's certificate of compliance procedure says off-grid generators must comply with SANS 10142-1 and that its direct customers declare them, and a changeover switch installed by a registered electrician keeps the generator from feeding back into the network while technicians work on it.

  • Editable appliance list with running and starting watts and quantities
  • Typical wattages for common household and job-site loads
  • Largest-start method with adjustable headroom
  • Optional credit for the generator's surge rating
  • Suggested common generator size and current at 120/240 V, or at the supply voltage you enter
  • Minimum kVA rating from the generator's rated power factor (0.8 by default)
Read the guide: What Size Generator Do I Need? Running Watts, Surge and Headroom

Updated

How to use the Generator Size Calculator

  1. Untick anything that will not run during the outage or job, and set quantities.
  2. Replace typical wattages with nameplate values where you can. For a motor without a starting figure, use two to three times the running watts.
  3. Add loads from the typical list or as custom lines.
  4. Choose headroom on the running load (20 to 25% is usual) and whether to count the generator's own surge rating.
  5. Read the running total, peak at motor start, minimum rated output and the suggested generator size.

Worked examples

House with a borehole pump

Input

Fridge-freezer 700/2 200 W, chest freezer 500/1 500 W, LED lights 100 W, TV and router 250 W, chargers 100 W, borehole pump 1 hp 2 000/4 000 W; 20% headroom; PF 0.8; 230 V

Output

Running 3 650 W (15.9 A at 230 V); peak 5 650 W; minimum 5 650 W rated, 7.06 kVA; suggested 6.5 kW

The pump start, not the running total, sets the size. If the set's data sheet allows a short surge of 20% above its rating, the minimum drops to 4 708 W (5.89 kVA); the "+20%" option shows that case.

Essentials only

Input

Fridge-freezer, LED lights, TV and router, chargers; 20% headroom; PF 0.8; 230 V

Output

Running 1 150 W (5.0 A); peak 2 650 W; minimum 3.31 kVA; suggested 3 kW

The fridge compressor's start is the largest surge here. A small inverter generator is often enough for this list, and it is quieter for neighbours during an evening slot.

Adding the microwave

Input

The borehole list plus a 1 000 W microwave (1 500 W drawn)

Output

Running 5 150 W (22.4 A at 230 V); peak 7 150 W; minimum 8.94 kVA; suggested 7.5 kW

A microwave adds no surge but 1 500 W of running load. Running it only while the pump is off keeps the generator a size smaller.

Background and insight

Resistive loads such as heaters, kettles and incandescent lights draw the same power when they switch on as when they run. Induction motors in compressors, pumps and fans draw several times their running current for a second or two while they accelerate, which shows up as starting watts. The generator must ride through that surge without its voltage collapsing.

The largest-start method assumes motors start one at a time, so it adds only the biggest surge: required watts = sum of running watts + max(starting − running). For a refrigerator (700 W running, 2,200 W starting), a 1/2 hp sump pump (1,050 / 2,150 W), a furnace blower (800 / 2,350 W), lights and electronics, the running total is 2,900 W and the furnace blower adds the biggest surge of 1,550 W, so the peak is 4,450 W and a 5,000 W generator fits. Typical wattages here are drawn from generator makers' worksheets and vary a lot between models, so nameplate figures (watts = volts × amps) always win.

Portable generators list a running (rated) and a higher surge (starting) wattage; inverter models typically surge 10 to 30% above rating for a few seconds. Home standby units are rated in kW at 0.8 power factor and quote motor-starting ability separately. By default this calculator does not count on any surge rating, the conservative choice; you can let it use a 20% or 50% surge margin. However you connect it, the NEC requires transfer equipment for optional standby systems (702.5) so the generator cannot back-feed the utility line.

Common use cases

  • Buying a portable generator

    Pick a size that keeps the fridge, sump pump and furnace running in an outage without tripping.

  • Specifying home standby

    Compare essential-circuit and whole-house loads before talking to an installer.

  • Job-site power

    Check that a generator can start a compressor while saws and lights are running.

  • RV and camping

    See whether a 2,000 W inverter generator can start the rooftop air conditioner.

Tips and limitations

  • Read the rating plate: a set marked 8 kVA and 6.4 kW has a power factor of 0.8. Enter that ratio in the power factor field to compare sets on the same basis.
  • Keep the geyser, stove and kettle off a small generator; resistive heating is the quickest way to overload it.
  • Start the largest motor first (the borehole pump), then the fridges, so their surges do not overlap.
  • Run petrol and diesel sets outdoors, away from doors, windows and air bricks, because of carbon monoxide.

Sources and further reading

  1. Management of certificates of compliance for electrical installations (240-170000465, revision 3), Eskom Distribution. Off-grid generators and islanded systems: customer declaration and compliance with the OHS Act and SANS 10142-1.
  2. Connection charges for customers connected to Eskom's distribution network (procedure), Eskom Distribution. Definitions: LV networks normally supply at 400/230 V three-phase or 230 V single-phase; MV reticulation is normally 11 or 22 kV.
  3. Interpreting load shedding schedules, Eskom. Stage sizes in MW, 2-hour and 4-hour blocks with 30 minutes added for switching, and how often an area is shed per stage.
  4. Small-scale embedded generation (SSEG), Eskom Distribution. Registration for grid-tied systems, exemption for fully off-grid systems, and the documents an application needs.

Frequently asked questions

What size generator do I need for load shedding?

For a fridge, lights, TV and router, about 3 to 3.5 kVA. Add a 1 hp borehole pump and the minimum rises to about 7 kVA because of its starting surge. Put your own appliances and their plate watts in the list for a real answer.

How do I convert kW to kVA for a generator?

Divide kW by the generator's rated power factor. At 0.8, a 5.65 kW requirement is 5.65 ÷ 0.8 = 7.06 kVA. Many sets print both figures on the plate; their ratio is the power factor to enter.

Do I need a changeover switch?

To power house circuits, yes. A changeover switch installed by a registered electrician isolates the house from the network so the generator cannot back-feed it. The work must comply with SANS 10142-1 and be covered by a Certificate of Compliance.

Do I have to tell Eskom about a generator?

Eskom's certificate of compliance procedure asks its direct customers for a declaration for any off-grid generator or islanded system. A generator that is synchronised with the grid is an embedded generator and falls under the SSEG registration rules instead.

Will a 5 kVA generator run a borehole pump?

A 1 hp pump on its own, usually yes. With a fridge-freezer, chest freezer and household loads running, the start of the pump pushes the peak to about 5.65 kW, which needs about 7 kVA at a 0.8 power factor unless the set is rated for a short surge.

Why does the current show at 230 V?

Single-phase supply in South Africa is 230 V. Enter 400 V only if you are checking a three-phase set, and then divide the total by three phases yourself.

Is there an in-depth guide to the Generator Size Calculator?