Performance Improvement Plan Template

Draft a PIP with documented issues, measurable goals, support, check-ins and outcomes, then track goal status and progress. Works in your browser, no sign-up.

The interactive tool loads here when JavaScript runs.

About this tool

What is Performance Improvement Plan Template?

This tool drafts a performance improvement plan (PIP) and tracks it through its check-ins. Each plan records the employee, manager, job title, department, a duration of 30, 60, 90 or 120 days and a review frequency. Inside it you document performance issues with examples, improvement goals with actions, measurable outcomes and resources, a check-in schedule with progress percentages, support provided, success criteria and what happens if the plan is not met.

The plan card shows counts of issues, goals and check-ins, each goal's status (Not Started, In Progress, Completed or At Risk) and the last three check-ins with a progress bar. You can copy a short summary, download the full plan as Markdown, or duplicate a plan as the starting point for a similar one. Switching to Employee View shows guidance for the person on the plan, including a 30-60-90 day structure and weekly self-assessment questions.

Plans are stored in this browser's localStorage. A PIP is a sensitive HR record, so do not draft one on a shared computer, and move the final version into your HR system. The tool provides structure, not legal advice: follow local employment law and your company's HR policy for how PIPs are issued, recorded and concluded.

  • Issues with examples, goals with measurable outcomes, support and consequences in one plan
  • Goal status tracking and dated check-ins with progress bars
  • Manager/HR and employee views with role-specific guidance
  • Markdown download, summary copy and plan duplication
  • Optional process checklist for the UK, Ireland, India, Canada or Australia, with sources
  • Stored locally in your browser with no account or upload
Read the guide: Master Performance Improvement Plans: Complete Guide to Employee Development & Team Growth

Updated

How to use Performance Improvement Plan Template

  1. Pick Manager/HR View or Employee View. The employee view adds a guide for the person on the plan below the list.
  2. Fill in Employee Name and Manager Name (both required), plus Job Title, Department, PIP Duration and Review Frequency, then click Create PIP. Load Sample shows a filled-in plan.
  3. Click the pencil on the plan to edit. Add each Performance Issue with a category, description, impact and specific examples, then add Improvement Goals with actions, measurable outcomes, resources, timeframe and status.
  4. Add a Check-in for each scheduled review with its date, a progress percentage from 0 to 100 and notes. Fill in Support Resources, Success Criteria and Consequences.
  5. Close the editor to see the summary. Use copy for a short summary, download for the full Markdown plan, or the duplicate button to start a similar plan.

Worked examples

One measurable goal

Input

Goal: Pull requests ready for review
Measurable outcome: 80% of PRs merged after one review round, measured over the last 4 weeks of the plan
Timeframe: 60 days, Status: In Progress

Output

### Goal 1: Pull requests ready for review
**Measurable Outcomes:**
- 80% of PRs merged after one review round, measured over the last 4 weeks of the plan
**Timeframe:** 60 days
**Status:** In progress

A good outcome names the metric, the threshold and the window it is measured over. Blank rows are left out of the export.

Copied summary of a new plan

Input

Create PIP for Sam Lee, 60 days, Bi-weekly, no goals filled in yet

Output

Performance Improvement Plan for Sam Lee
...
Goals: 0 improvement goals defined
Support: 0 resources provided

The summary counts only goals and resources that have text, so an empty draft does not look complete.

Background and insight

A PIP is a written, time-boxed plan that tells an employee that their performance is below what the role requires, what specifically must change, how it will be measured, what support they will get and by when. Plans of 30 to 90 days are the most common; shorter windows rarely leave room to show a sustained change, and longer ones often signal that the bar was never clear.

PIPs have a reputation as a paper trail before a dismissal, and in some companies that is what they are. A plan that is meant to succeed looks different: the issues were already raised in earlier 1:1s, the examples are dated and specific, the measurable outcomes are achievable for someone performing at the expected level (not a stretch target), the support is real and scheduled, and the check-ins happen on time with written notes. If any of those are missing, an employee on the plan has good reason to doubt it is genuine.

Fairness also means clarity. Softened wording such as calling a performance gap "an opportunity to grow into a senior role" feels kinder, but it can leave the employee unsure how serious the situation is. State plainly that current performance does not meet expectations, list what success looks like, and say what may happen if it is not reached. The Consequences field exists for that sentence.

Common use cases

  • Managers drafting a first PIP

    Work through issues, goals, support and consequences in order so nothing the employee needs to know is missing.

  • HR partners reviewing a draft

    Download the Markdown and check that each issue has dated examples and each goal has a measurable outcome.

  • Employees on a plan

    Re-enter the plan you received in Employee View to track your own progress and prepare for each check-in.

  • Running check-ins

    Log each check-in with notes and a progress percentage so the final decision rests on a written record.

Tips and limitations

  • If the employee is hearing about a problem for the first time in the PIP, it is too early for a PIP. Raise it in 1:1s with examples first.
  • Measurable outcomes should describe the normal bar for the role, not an exceptional one. A plan nobody at that level could pass is not a fair plan.
  • Write check-in notes on the day, with what was observed. Notes reconstructed weeks later are less reliable and less fair.
  • Edit mode has no delete button for individual rows; clear a row's text and it is left out of the export.
  • Data is saved only in this browser. Treat drafts as confidential and remove them from the device once the plan is filed.

Sources and further reading

  1. Problems with an employee's performance, Acas. What a PIP should contain: specific objectives, a reasonable timeline, support, and stated consequences
  2. Acas Code of Practice on disciplinary and grievance procedures, Acas. The UK code on fair procedure when poor performance becomes a formal matter

Frequently asked questions

What should a performance improvement plan include?

A PIP should include the specific performance issues with dated examples, measurable goals tied to the role's normal expectations, the support the company will provide, a check-in schedule, the plan's length, success criteria and the possible outcome if goals are not met. Both manager and employee should receive the same written version.

How long should a PIP last?

Most PIPs run 30, 60 or 90 days, and the tool offers 30 to 120. Choose a length long enough for the improvement to be visible in real work: a code quality goal needs several review cycles, while attendance can be judged faster. Your HR policy may set a standard length.

How often should PIP check-ins happen?

Weekly check-ins are the usual default because they catch problems while there is still time to adjust. Bi-weekly can work for 90-day plans with longer-running goals. Write notes and a progress estimate at every check-in so the final decision is based on a record, not memory.

Can a PIP be written fairly?

A PIP is fair when the employee already knew about the problems, the examples are specific, the goals are achievable at the expected level, the promised support actually happens and check-ins are held on time. Clear wording about the gap and the possible consequences is part of fairness, not a contradiction of it.

I have been put on a PIP. How can this tool help me?

Switch to Employee View and enter the plan you received, including each goal and measurable outcome. Log your own notes and progress after every check-in, keep examples of work that meets each outcome, and ask your manager to clarify any goal you cannot measure. Keep your own copy outside work systems if company policy allows.

Is my PIP data stored on a server?

No. Plans are stored in your browser's localStorage on this device and are not uploaded. That keeps drafts private but means anyone with access to the browser profile can open them, so avoid shared machines and move final plans into your HR system.

Is there an in-depth guide to Performance Improvement Plan Template?

Yes. “Master Performance Improvement Plans: Complete Guide to Employee Development & Team Growth” covers the background, how it works, common pitfalls and worked examples. Read the full guide.