About this toolWhat is the Concrete Calculator?
Every concrete order in India starts with the volume: cubic metres for a ready-mix (RMC) transit mixer, cft for a contractor's rate or for comparing quotes. This version takes the slab, footings, PCC bed or steps in metres and centimetres, adds wastage and gives the volume in m³ and cft, the RMC cost at your rate per m³ and, if you mix on site, the cement, sand and aggregate (jelly or gitti in many cities) for the nominal mix you choose.
One cubic metre is 35.31 cft, so a 3.6 x 3 m roof slab 12.5 cm thick with 5% extra is 1.418 m³ or about 50 cft. RMC plants usually set a minimum load, so a small slab is often cheaper to mix on site, while a few cubic metres of footings are worth pricing with a transit mixer. For the cement bags, sand and aggregate per cubic metre of M20, M15 or M10, and the water per bag, use the [Concrete Mix Ratio Calculator](/en-in/concrete-mix-ratio-calculator).
IS 456 permits nominal mixes only for M20 and below, prefers design mixes, and states nominal proportions by mass per 50 kg of cement (Table 9). For reinforced concrete it sets M20 as the minimum grade in mild exposure and M25 in moderate exposure (Table 5). Use these figures for estimating and ordering; the structural design of slabs, beams and footings belongs to your engineer.
- Six pour shapes: slab, footing, round column or hole, wall, curb and gutter, and steps with an optional landing
- Imperial and metric inputs that convert in place when you switch
- Bag counts for 40, 50, 60 and 80 lb and 20 or 25 kg bags from published yields
- Ready-mix order rounded to an editable increment, plus cost for bags and ready-mix
- Formula panel, copy and share link; runs entirely in the browser
Updated
How to use the Concrete Calculator
- Keep units on metric: lengths in metres, thickness in centimetres. For a slab measured in feet, switch to imperial.
- Choose the shape and quantity, for example six identical column footings.
- Add 5% for a formed slab, more for uneven excavation.
- Open "Site mix" and pick the nominal mix: M20 for RCC slabs and footings, M7.5 or M10 for PCC beds.
- Enter your ready-mix (RMC) rate per m³ in ₹ if you are comparing with a transit mixer delivery.
Worked examples
Roof slab for a 12 x 10 ft room in M20
Input
Slab 3.6 x 3 m x 12.5 cm, 5% extra, nominal mix 1 : 1.5 : 3
Output
1.418 m³; 11.43 bags of cement (buy 12); sand 0.595 m³ (21 cft); aggregate 1.191 m³ (42 cft)
Thickness, steel and the mix must come from the structural drawing; this sets the material order once those are fixed.
PCC bed under a wall footing
Input
10 m x 1 m x 10 cm, 5% extra, nominal mix 1 : 4 : 8 (M7.5)
Output
1.05 m³; 3.58 bags of cement; sand 17.6 cft; aggregate 35.1 cft
Lean PCC under footings uses far less cement per m³ than structural concrete, which is why the ratio matters more than the volume for the cement order.
Six isolated column footings in M20
Input
Footing 1.2 x 1.2 m x 30 cm, quantity 6, 5% extra, 1 : 1.5 : 3
Output
2.722 m³; 21.95 bags of cement (22); sand 40.4 cft; aggregate 80.7 cft
At about 2.7 m³ a ready-mix load is worth pricing in cities, especially where quality control on site is hard.
Background and insight
Bag counts use published yields rather than weight. The QUIKRETE Concrete Mix data sheet lists about 0.30 cubic feet for a 40 lb bag, 0.45 for 60 lb and 0.60 for 80 lb, and Sakrete gives the same 0.6 cubic feet for its 80 lb bag. Those yields are for mixed concrete, so a cubic yard (27 cubic feet) takes 45 bags of 80 lb or 60 bags of 60 lb. Kilogram bags sold outside the US are scaled from the 80 lb figure by weight, roughly 11.7 litres per 25 kg bag; the yield printed on your bag wins if it differs.
Ready-mix plants batch by the cubic yard or cubic metre and many dispatch in quarter-yard steps, so the calculator rounds up to an increment you can change. Small loads often carry a short-load fee, which is why a 1.4 yard patio can cost nearly as much as a 3 yard one. Normal-weight concrete weighs about 150 lb per cubic foot (2,400 kg per cubic metre), which matters if you are hauling bags in a car or checking a trailer limit.
Common use cases
Patios, sheds and hot-tub pads
Size a slab and see whether 60-odd bags or one short ready-mix load makes more sense for the job.
Fence and deck posts
Multiply one hole by the number of posts to buy the right pallet quantity in one trip.
Footings and piers
Price square pads and round sonotube piers for a deck or small extension before calling the plant.
Curbs, edging and steps
Handle the awkward L-shaped curb and gutter section and stacked steps without sketching volumes by hand.
Tips and limitations
- IS 456 clause 13.5.1: keep concrete continuously wet for at least 7 days with ordinary Portland cement and 10 days with blended cements such as PPC or PSC, or in hot, dry weather.
- If extra water is needed for placing, IS 456 says to add cement in proportion so the water-cement ratio does not rise.
- Sand bulks when damp, so measuring sand by volume from a moist heap gives less sand than intended; site engineers allow for bulking or batch by weight.
Sources and further reading
- IS 456:2000 Plain and Reinforced Concrete: Code of Practice, Bureau of Indian Standards (via Public.Resource.Org). Clause 9.3 and Table 9 nominal mixes; Table 5 minimum grades; 13.5.1 curing.
- National Building Code of India, Bureau of Indian Standards
Frequently asked questions
How do I calculate the concrete volume of a slab in cft?
Length x width x thickness in metres gives m³; multiply by 35.31 for cft. A 3.6 x 3 m slab 12.5 cm thick is 1.35 m³, and with 5% extra 1.418 m³, which is about 50 cft.
How much RMC do I need for column footings?
Work out one footing and multiply by the number. Six footings of 1.2 x 1.2 m at 30 cm are 2.592 m³, or 2.722 m³ with 5% extra. Add the columns and plinth beams if they are poured the same day, and confirm the plant's minimum load.
How much extra concrete should I order?
About 5% for a slab on shuttering, more for footings in uneven excavation, where the trench is rarely the exact size on the drawing. Running short in the middle of a slab pour leaves a cold joint, so round up.
Where do I find cement bags, sand and aggregate per cubic metre?
Open "Site mix" here for the split of your volume, or use the [Concrete Mix Ratio Calculator](/en-in/concrete-mix-ratio-calculator) for bags per cubic metre, the mix ratios of M20, M15 and M10 and the water per bag.
Can nominal mix be used for an RCC roof slab?
IS 456 allows nominal mixes up to M20 with the engineer-in-charge's permission, and M20 is the minimum grade for reinforced concrete in mild exposure. In moderate or harsher exposure the minimum rises to M25, which needs a design mix.
How do I convert m³ to cft and brass?
One m³ is 35.31 cft, and a brass is 100 cft, so 1 m³ is about 0.35 brass. Sand and aggregate are often sold by the brass, while RMC is always priced per m³.
Is there an in-depth guide to the Concrete Calculator?
Yes. “Estimating Concrete, Flooring, Tile and Gravel Without Running Short” covers the background, how it works, common pitfalls and worked examples. Read the full guide.